Surface stack kick sheet - Work
NOTICE: Our Mathcad database got attacked and infected with a virus. Unfortunately, we've had to shut it down until further notice.
You can safely browse the pages, as the Mathcad server was separate to this main website, and was only accessible here. (We used something called an iFrame, which is like a window into a different website).
UPDATE 28th of January 2020: the virus happened just over a week ago. We've temporarily cut and pasted the text parts of the Mathcad pages rather than having blank pages there.
UPDATE 3rd of February 2020: We've been unable to recover the Mathcad worksheets and offer them in a format that provided total security to users. They were published a decade ago, and our IT people say that they would need a complete re-creation with the latest code and security fixes.
APPEAL: These 44 pages were created, and offered as a free resource for over a decade. We know from our website analytics that more than 1000 users visited each month. If only half of these regular visitors donated $20, we would have enough to create an even better solution. As you know, time is money, have these Mathcad pages saved you $20 in time over the years? We expect that they have, not to mention the learning opportunities provided to new engineers entering the industry.
Please, donate at least $20 as a one-off payment, to bring back the drillers Mathcad back as an always free to use resource!
YES! I've gotten value from the drillers Mathcad in the past, and a $20 is a very affordable way of saying thanks. I also want to preserve this tool for future engineers.
NO! I can't or won't donate to the restoration fund. I'm happy to spend a few minutes to offer a testimonial to help encourage the effort. These worksheets do have value. Offer Feedback.
Kick Control worksheet, release 1a, issued 20 Oct 08. Work version.
Sponsored and approved by Aberdeen Drilling Schools – the home of well control training
Pre-kick input – well information
Pre-kick input – string and mud data
4.5″ 9.5 ppf4.5″ 10.5 ppf4.5″ 11.6 ppf4.5″ 13.5 ppf4.5″ 15.1 ppf5″ 11.5 ppf5″ 13 ppf5″ 15 ppf5″ 18 ppf5″ 21.4 ppf5″ 23.2 ppf5″ 24.1 ppf5.5″ 14 ppf5.5″ 15.5 ppf5.5″ 17 ppf5.5″ 20 ppf5.5″ 23 ppf5.5″ 26.8 ppf5.5″ 29.7 ppf5.5″ 32.6 ppf5.5″ 35.3 ppf5.5″ 38 ppf5.5″ 40.5 ppf5.5″ 43.1 ppf6.625″ 20 ppf6.625″ 24 ppf6.625″ 28 ppf6.625″ 32 ppf7″ 17 ppf7″ 20 ppf7″ 23 ppf7″ 26 ppf7″ 29 ppf7″ 32 ppf7″ 35 ppf7″ 38 ppf7″ 42.7 ppf7″ 46.4 ppf7″ 50.1 ppf7″ 53.6 ppf7″ 57.1 ppf7.625″ 24 ppf7.625″ 26.4 ppf7.625″ 29.7 ppf7.625″ 33.7 ppf7.625″ 39 ppf7.625″ 42.8 ppf7.625″ 45.3 ppf7.625″ 47.1 ppf7.625″ 51.2 ppf7.625″ 55.3 ppf7.75″ 46.1 ppf8.625″ 24 ppf8.625″ 28 ppf8.625″ 32 ppf8.625″ 36 ppf8.625″ 40 ppf8.625″ 49 ppf9.625″ 32 ppf9.625″ 36 ppf9.625″ 40 ppf9.625″ 43.5 ppf9.625″ 47 ppf9.625″ 53.5 ppf9.625″ 58.4 ppf9.625″ 59.4 ppf9.625″ 64.9 ppf9.625″ 70.3 ppf9.625″ 75.6 ppf10.75″ 32.75 ppf10.75″ 40.5 ppf10.75″ 45.5 ppf10.75″ 51 ppf10.75″ 55.5 ppf10.75″ 60.7 ppf10.75″ 65.7 ppf10.75″ 73.2 ppf10.75″ 79.2 ppf10.75″ 85.3 ppf11.75″ 42 ppf11.75″ 47 ppf11.75″ 54 ppf11.75″ 60 ppf11.75″ 65 ppf11.75″ 71 ppf13.375″ 48 ppf13.375″ 54.5 ppf13.375″ 61 ppf13.375″ 68 ppf13.375″ 72 ppf16″ 65 ppf16″ 75 ppf16″ 84 ppf16″ 109 ppf18.625″ 87.5 ppf20″ 94 ppf20″ 106.5 ppf20″ 133 ppf8.625″ 44 ppf
5
4.276
Select the casing in use
Drillpipe OD and ID
inmm
6500
3
Casing shoe TVD
ftm
HWDP ID
6500
350
ftm
Casing shoe MD
HWDP length
17
psi/ftSG or kg/lppglb/ft3ppbkPa/m
8
2.8
inmm
Casing shoe strength gradient
DC OD and ID
12.25
inmm
160
ftm
Hole diameter
DC length
4.3
GallonsBarrelsLitresCubic metres
30
350
psiPakPaMPa
Pump output per stroke
SCR strokes/min and pressure
Post-kick data
14
psi/ftSG or kg/lppglb/ft3ppbkPa/m
1000
Drilling fluid density
SIDPP
psiPakPaMPa
8000
1200
Well TVD
ftm
8000
26
lm3bblft3
Well MD
Influx volume
Click here when any values are modified to update the result.
Results
Bottom hole pressure
Kill mud gradient
Kill mud weight
Initial circulating pressure
Final circulating pressure
Phase 1, surface to bit
Strokes; Time;
Phase 2, bit to shoe
Strokes; Time;
Phase 3, ends after “bottoms up”
Strokes; Time;
Phase 4, complete circulation
Strokes; Time;
Phase 1 table and graph; oilfield units
Strokes psi
Phase 1 table and graph; metric units
Strokes kPa
Worksheet references
Copyright Drillers.com Inc.
The variable names used in all Drillers.com worksheets can be found at www.drillers.com/download/standardvariablenames.doc .
Aberdeen Drilling Schools. Well Control for the Rig-Site Drilling Team.
Version 1 of this worksheet was released on 3 October 2008 by Steve Devereux.