Case Study

Post Job Analysis

A significant primary cementing operation was performed that involved 9 5/8” and 7” liners. The operation encountered challenges, prompting an exhaustive post-job analysis to...

Primary Cementing Case Study

On behalf of a client, we performed a comprehensive engineering analysis on four primary cementing cases. Our assessment focused on investigating cementing events in...

9 5/8” Liner: Post-Job Analysis Case Study

This case study focuses on the post-job analysis of a Polyphosphoric Acid (PPA) infill drilling campaign, aiming to enhance zonal isolation. The document in...

7 Casing Cementing Case Study

This case study focuses on a detailed analysis of a 7” Casing cementing operation. The objective was to gather information, playback the job design...

5 Casing Cementing Case Study

This case study delves into a 5" Liner cementing operation. The study aims to analyze the operation, identify challenges, and provide recommendations for future...

Well Integrity Case Study – North Sea

To address the well-integrity challenges and to follow the HS&E notices, the International Oil Company initiated a bespoke well-integrity training course for its offshore-based...