Case Study

Introduction to Drilling for New Engineers and Non-Specialists

Day 11. E&P Drilling Industry• Drilling history and well life-cycles• Design, construct and engineer wells• Drilling well life-cycle video2. Petroleum Geology and Drilling Operations•...

Managing Lost Time (MLT)™

Day 1 Labelling Well ProblemsRegistration and Welcome (Coffee & Tea)Workshop purpose and introductions -Group exercise: Establish individual goals & objectives1.1 Optimising (loss control) within well...

Post Job Analysis

A significant primary cementing operation was performed that involved 9 5/8” and 7” liners. The operation encountered challenges, prompting an exhaustive post-job analysis to...

Primary Cementing Case Study

On behalf of a client, we performed a comprehensive engineering analysis on four primary cementing cases. Our assessment focused on investigating cementing events in...

9 5/8” Liner: Post-Job Analysis Case Study

This case study focuses on the post-job analysis of a Polyphosphoric Acid (PPA) infill drilling campaign, aiming to enhance zonal isolation. The document in...

7 Casing Cementing Case Study

This case study focuses on a detailed analysis of a 7” Casing cementing operation. The objective was to gather information, playback the job design...
Malcare WordPress Security