Blockline and crown loads - Audit

NOTICE: Our Mathcad database got attacked and infected with a virus. Unfortunately, we've had to shut it down until further notice.

You can safely browse the pages, as the Mathcad server was separate to this main website, and was only accessible here. (We used something called an iFrame, which is like a window into a different website).

UPDATE 28th of January 2020: the virus happened just over a week ago. We've temporarily cut and pasted the text parts of the Mathcad pages rather than having blank pages there.

UPDATE 3rd of February 2020: We've been unable to recover the Mathcad worksheets and offer them in a format that provided total security to users. They were published a decade ago, and our IT people say that they would need a complete re-creation with the latest code and security fixes.

APPEAL: These 44 pages were created, and offered as a free resource for over a decade. We know from our website analytics that more than 1000 users visited each month. If only half of these regular visitors donated $20, we would have enough to create an even better solution. As you know, time is money, have these Mathcad pages saved you $20 in time over the years? We expect that they have, not to mention the learning opportunities provided to new engineers entering the industry.

Please, donate at least $20 as a one-off payment, to bring back the drillers Mathcad back as an always free to use resource!

YES! I've gotten value from the drillers Mathcad in the past, and a $20 is a very affordable way of saying thanks. I also want to preserve this tool for future engineers.

NO! I can't or won't donate to the restoration fund. I'm happy to spend a few minutes to offer a testimonial to help encourage the effort. These worksheets do have value. Offer Feedback.

Blockline Loadings, release 5, issued 24 April 2008. AUDIT version.

The current release of this worksheet exists in different versions. They are identical apart from the way they are formatted. The Work version hides intermediate calculations and allows the user to see the results just below the inputs. This is useful for quick “what-if” games, changing various inputs to see what works best. The Audit version displays all intermediate calculations. The PDA version removes all text and formats the input and output fields for optimum viewing on a mobile, small-screen device.

This Audit version of the worksheet shows the formulae and intermediate results to allow auditing.

User input

 

1″ 6×19 IPS IWRC1″ 6×19 EIPS IWRC1.125″ 6×19 IPS IWRC1.125″ 6×19 EIPS IWRC1.25″ 6×19 IPS IWRC1.25″ 6×19 EIPS IWRC1.375″ 6×19 IPS IWRC1.375″ 6×19 EIPS IWRC1.5″ 6×19 IPS IWRC1.5″ 6×19 EIPS IWRC1.625″ 6×19 IPS IWRC1.625″ 6×19 EIPS IWRC1.75″ 6×19 IPS IWRC1.75″ 6×19 EIPS IWRC1.875″ 6×19 IPS IWRC1.875″ 6×19 EIPS IWRC2″ 6×19 IPS IWRC2″ 6×19 EIPS IWRC

 

0

 

lbkg

Either; select a blockline

OR, enter wire breaking strength

 

10

Number of lines strung. Nbl =

 

3.5

Safety factor required for the blockline. SFbl =

 

PlainRoller

Select a block bearing type to determine API friction factor

 

1000000

 

lbkg

What is the maximum crown load (eg derrick limit)? Fcllimit =

 

45000

 

lbkg

Travelling block weight. mtb =

 

250000

 

lbkg

Desired load carried under the travelling block. Fhlbb =

  

Click here when any values are modified to update the result.

Calculations

First calculate the limiting loads within the capacity of the line and the crown/derrick.

Reeving efficiency;

Max fast line tension;

Max hook load;

Dead line tension at max hook load;

Load on the crown at maximum hook load;

Now compare the limiting crown load with the crown load at the maximum hook load and return the lowest value;

Using the lower of the two, work out the hook load, fast line and dead line loads.

Calculate the maximum useable load below the block

Actual safety factor on the fast line at the maximum (limiting) hook load.

Second calculate the actual loads arising from the desired load under the hook.

Total hook load = load under the hook plus the travelling block.

Fast line load and dead line loads.

Actual safety factor on the fast line at the desired hook load.

Actual load on the crown.

Desired hook load as a percentage of maximum.

Results

1 – limits of the line and derrick; the limiting 

Wire rope strength

Maximum hook load (including travelling block)

Maximum useable hook load (accounting for block)

2 – loads arising from the desired load under the travelling block,   or 

Fast line load

Dead line load

Crown load

Safety factor on the fast line

Specified hook load as % of maximum

Worksheet references

Institut Francais du Petrole. “Drilling Data Handbook” 6th Edition.