Pipe Slugging - Work

NOTICE: Our Mathcad database got attacked and infected with a virus. Unfortunately, we've had to shut it down until further notice.

You can safely browse the pages, as the Mathcad server was separate to this main website, and was only accessible here. (We used something called an iFrame, which is like a window into a different website).

UPDATE 28th of January 2020: the virus happened just over a week ago. We've temporarily cut and pasted the text parts of the Mathcad pages rather than having blank pages there.

UPDATE 3rd of February 2020: We've been unable to recover the Mathcad worksheets and offer them in a format that provided total security to users. They were published a decade ago, and our IT people say that they would need a complete re-creation with the latest code and security fixes.

APPEAL: These 44 pages were created, and offered as a free resource for over a decade. We know from our website analytics that more than 1000 users visited each month. If only half of these regular visitors donated $20, we would have enough to create an even better solution. As you know, time is money, have these Mathcad pages saved you $20 in time over the years? We expect that they have, not to mention the learning opportunities provided to new engineers entering the industry.

Please, donate at least $20 as a one-off payment, to bring back the drillers Mathcad back as an always free to use resource!

YES! I've gotten value from the drillers Mathcad in the past, and a $20 is a very affordable way of saying thanks. I also want to preserve this tool for future engineers.

NO! I can't or won't donate to the restoration fund. I'm happy to spend a few minutes to offer a testimonial to help encourage the effort. These worksheets do have value. Offer Feedback.

Pipe slugging, release 1, issued 29 Jan 2009. WORK version.

The current release of this worksheet exists in different versions. They are identical apart from the way they are formatted. The Work version hides intermediate calculations and allows the user to see the results just below the inputs. The Audit version displays all intermediate calculations and results to allow auditing.

User input

10

psi/ftSG or kg/lppgkPa/mlb/ft3lb/bbl

Active mudweight. Jmudsg =

15

psi/ftSG or kg/lppgkPa/mlb/ft3lb/bbl

Slug mudweight. Jslugsg =

10

lm3bblft3

Slug volume. Vslug =

4.276

inmm

Drillpipe ID. L_ddp =

1000

lm3bblft3

Volume of active system (optional). Vmudact =

Click here when any values are modified to update the result.

Results

Length of dry pipe after full u-tubing

Volume increase u-tubing only

Total volume increase (slug vol + utubing)

Active system density after slug mixed

Worksheet references

Version 1 of this worksheet released on 29 January 2009 by Steve Devereux CEng after a request by Mr Randy Davis of NRG Ltd.

Malcare WordPress Security